MMRDA Skywalks List

PROPOSED SKYWALKS IN MUMBAI METROPOLITAN REGION (MMR)

No.

Station

Scope of Works

Proposed Agency

MMRDA Div. & Concerned Officer / Status

MSRDC SKYWALKS

SKYWALKS WORKS IN PROGRESS

1

Chinchpokali Skywalk connecting existing Railway’s Foot Over Bridge to Ambedkar Road at the East Side of Station. (4.88 meters wide x 200 meter long)

MSRDC

2

Parel Skywalk connecting East & West side of the Station (with landing at all platforms). 4.88 meters wide x 120 meters long)

MSRDC

Skywalk (at Mumbai end) connecting existing Railway’s Foot Over Bridge to Ambedkar Road (at East Side).(4.88 meter wide x 200 meters long)

3

Reay Road Skywalk across D’Mello Road (at Kurla end) a landing at all Platforms.(3.66 meters wide x 100 meters long)

MSRDC

4

Sewri Skywalk connecting Railway’s Foot Over Bridge to Public Foot Over Bridge (of D’Mello Road). (3.66 meters wide x 100 meters long)

MSRDC

5

Wadala Road Skywalk across ‘P’ D’Mello Road & connecting existing Railway’s Foot Over Bridge of the Station (at Kurla end) (4.88 meters wide x 125 meters long)

MSRDC

6

Vasai Road (W) Construction of skywalk

MSRDC

7

Goregaon (W) Construction of skywalk

MSRDC

8

Vileparle (W) Construction of skywalk

MSRDC

9

Kandivali (E) Construction of skywalk

MSRDC

10

Lowerparel-Currey road walkway (E) Construction of skywalk

MSRDC

11

Grant Road Construction of skywalk

MSRDC

12

Masjid Stn area (W) Construction of skywalk

MSRDC

DROPPED

13

Naigaon Construction of skywalk

MSRDC

DROPPED

14

Sand Hurst Road Skywalk connecting from (South side of) Hankok Bridge (at the West side of track) to the platform No.1 & 2 of the station. (3.66 meters width x 100 meters long)

MSRDC

DROPPED

KDMC  SKYWALK

SKYWALKS WORKS IN PROGRESS

15

Kalyan (W) Skywalk connecting existing Railway’s FOB (Under Construction) to Valli Peer Road (Kalyan Stn Rd at West end) and also to Kolsawadi side (at East end).(4.88 m wide x 250 m long)

KDMC

16

Kalyan (E) Construction of skywalk

KDMC

MMRDA SKYWALKS

SKYWALK COMPLETED

17

Bandra (E) to Kalanagar Construction of skywalk

MMRDA

18

Kanjurmarg (E) Construction of skywalk

MMRDA

19

Bandra (E) BA local station to Kalanagar – Kherwadi- Extension

MMRDA

20

Dahisar (W) Construction of skywalk

MMRDA

21

Badlapur (W) Construction of skywalk

MMRDA

22

Mira Road Construction of skywalk

MMRDA

SKYWALKS WORKS IN PROGRESS

23

Virar (W) Construction of skywalk

MMRDA

24

Virar (E) Construction of skywalk

MMRDA

25

Bandra (W) Construction of skywalk

MMRDA

26

Andheri (E) Construction of skywalk

MMRDA

27

Santacruz  (E) Construction of skywalk

MMRDA

28

Ulhasnagar (E) Construction of skywalk

MMRDA

29

Ulhasnagar (W) Construction of skywalk

MMRDA

30

Bhandup (W) Construction of skywalk

MMRDA

31

Vidyavihar (E) Construction of skywalk

MMRDA

32

Vidyavihar (W) Construction of skywalk

MMRDA

33

Kurla (E) Construction of skywalk

MMRDA

34

Ghatkopar (W) Construction of skywalk

MMRDA

35

Thane (E) Construction of skywalk

MMRDA

36

Bhayander (W) Construction of skywalk

MMRDA

37

Mulund (W) Construction of skywalk

MMRDA

38

Badlapur (E) Construction of skywalk

MMRDA

39

Bhayander (E) Construction of skywalk

MMRDA

40

Borivali (W) Construction of skywalk

MMRDA

41

Chembur Construction of skywalk

MMRDA

42

Dadar  (E) Pt II Construction of skywalk

MMRDA

43

Dadar – (E)  Pt III Construction of skywalk

MMRDA

44

Dahisar (E) Construction of skywalk

MMRDA

45

Santacruz (W) Construction of skywalk

MMRDA

46

Mulund (E) Construction of skywalk

MMRDA

DROPPED

47

Dadar  (E) Pt I Construction of skywalk

MMRDA

DROPPED

48

Kurla (W) Construction of skywalk

MMRDA

DROPPED

49

Ambernath ( E) Construction of skywalk

MMRDA

50

Ambernath ( W) Construction of skywalk

MMRDA

51

Vikhroli (E) Construction of skywalk

MMRDA

APPROVAL 22 Aug 2008

52

Vikhroli (W) Construction of skywalk

MMRDA

APPROVAL 22 Aug 2008

53

Mahim (W) Construction of skywalk up to Mahim Dargah via Mahim Church

MMRDA

APPROVALS 18 SEP 2008

54

Mahalaxmi (W) Construction of skywalk up to Mahalaxmi Temple

MMRDA

APPROVALS 07 Oct 2008

55

Khada Parsi Statue Construction of skywalk up to Nisbit Junction

MMRDA

Sanjay Barve, IPS, Jt CP Traffic

56

Sion Construction of skywalk  up to Dharavi 90` Road and EEH

MMRDA

Sanjay Barve, IPS, Jt CP Traffic

57

Ghatkopar (E) Construction of skywalk

MMRDA

58

Mahim (E) Construction of skywalk up to Mahim Badi Masjid

MMRDA

APPROVALS 25 SEP 2008 DROPPED

TENDERS TO BE INVITED BY ENGINEERING  DIVISION

59

Mankhurd Construction of skywalk up to Lallu Bhai Compound

MMRDA

Sh. Kapil Patil MLA

60

Shahad (E) Construction of skywalk at Shahad (E)

MMRDA

Suresh ( Pappu) Kalani, MLA

61

Shahad (W) Construction of skywalk at Shahad (W)

Suresh ( Pappu) Kalani, MLA

62

Dadar Construction of East-West connector skywalk along Tilak Bridge

MMRDA

Sanjay Barve, IPS, Jt CP Traffic.

63

Vithal Vadi (E) Construction of skywalk  up to Pawai Chowk

MMRDA

Suresh (Pappu) Kalani, MLA

64

Vithal Vadi (W) Construction of skywalk  up to Vyapari Gali

MMRDA

Suresh (Pappu) Kalani, MLA .

65

Matheran Construction of skywalk from Aman Lodge to Sakha Ram Tuka Ram point

MMRDA

Matheran Nagaradhaykhs

66

Komothe  (Navi Mumbai) Construction of skywalk

MMRDA

Ajit Pawar MLA

67

Vashi (Navi Mumbai) Construction of skywalk

MMRDA

Ajit Pawar MLA

DROPPED AT PLANNING STAGE

68

CST to Churchgate Construction of skywalk

MMRDA

Dropped

69

Churchgate to Mantralya Construction of skywalk

MMRDA

Dropped

70

Vidhan Bhavan to Regal Cinema Construction of skywalk

MMRDA

Dropped

71

Regal Cinema to CST Construction of skywalk

MMRDA

Dropped

NEW PROPOSALS

72

Marine Lines Construction of skywalk up to Vardhman Chowk

MMRDA

Atul H Shah, Ex MLA

73

Nariman Point Construction of skywalk up to Colaba

MMRDA

Annie Shekhar, MLA

74

Marine Lines Construction of skywalk up to Kalba Devi Road Junction

MMRDA

Raj Purohit, MLA

75

Mantralya Construction of skywalk up to Nariman Point and CST

MMRDA

Raj Purohit, MLA

76

Matunga Construction of skywalk up to Wadala

MMRDA

Jaganath Shetty MLA

77

Mithi Bai College Construction of skywalk up to Centaur Hotel

MMRDA

Ashok Bhau Jadhav MLA

78

Vile Parle (E) Construction of skywalk

MMRDA

79

Borivali (E) Construction of skywalk

MMRDA

Gopal Shetty, MLA

80

Jogeshwari Construction of skywalk at Jogeshwari

MMRDA

MCGM

81

Worli Naka Construction of skywalk up to Poddar Hospital

MMRDA

Sachin Ahir, MLA

82

Varsova Jetty Construction of skywalk up to Madh Jetty

MMRDA

Baldev Khosla, MLA

83

Usha Nagar, Bhandup (W) Construction of skywalk

MMRDA

Housing Society Sanjay Deena Patil ,MP

84

Panvel Construction of skywalk up to Baba Saheb Ambedkar Statue

MSRDC

Parshant Thakur Nagaradhyaksh

85

Panvel Bus Stand Construction of skywalk from Hotel Smarat to NH4

MSRDC

Parshant Thakur Nagaradhyaksh

86

Malad (E) Construction of skywalk up to Pushpa Park

MMRDA

Suchitra Naik Nagarsewika and Sunil Parbhu Sabha Grayha Neta MCGM

87

Malad (W) Construction of skywalk up to Mahila College

MMRDA

Suchitra Naik Nagarsewika and Sunil Parbhu Sabha Grayha Neta MCGM

88

Goregaon (E) Construction of skywalk Goregaon (E)

MSRDC

Mr Subash Desai , MLA

89

Khapoli Construction of skywalk Khapoli Rly Stn to Police stn, Shashtri Nagar

Mr Devender Sattam , MLA

90

Vasai Road (E) Construction of skywalk Vasai Road (E) up to CIDCO office

Mr D B Shingda , MP




Similar Articles

9 thoughts on “MMRDA Skywalks List

  1. Skywalk over railway crossing at Vikhroli East to West is urgently required as more railway accedent has been reporting and St. Joseph High School is very much near to the track. As it is goodnew that two skywalk has been approved for east and west, Will you intimate whether skywalk connect east and west (Vikhroli). I would be very much grateful if you intimate the same. Various proposals of sky walk will defenetiely help people from congestion.
    Thanking you.

  2. When is the Goregaon Skywalk going to be completed?. My shop & our Building is completely surrounded by the raw material dumbped by the J.Kumar people. Rats Die, Garbage is thrown on it… Keeps on smelling the whole day. What the hell is happening… If they dont want to complete the Skywalk, then why the hell do they initiate such a burden on Public Road….????

  3. Till date the sky walk built by MMRDA at Badlapur from east to west has not been connected, thereby making difficult to the commuters and it is a waste of money if it is not connected. Why it is not connected and when it is expected to be connected

  4. We require a sky walk adjacent to the existing foot overbride connecting platform No.7 to Lokgram. The existing FOB is fully packed during morning and evening hours . Increase in population in eastern side has immensely increased the pressure on the existing FOB. besides the existing FOB is in a very pathetic condition with all tiles broken. Immediate steps should be taken to replace the tiles. The tiles earlier laid on the FOB is of very poor quality and of inferior grad. please replace it with good quality tiles and guarantee of the contractor to be obtained that the tiles will last for a minimumperiod of 10 years.

  5. It is urgently requested that the Sky Walk from Badlapur East to West is not still connected. Already more than three years have lapsed and the same is still pending even after assurances given so many times for connecting the same. Since day to day public has increased, it is requested to connect the same at the earliest

Leave a Reply

Top