Five Reasons to invest in Wadala

By Samyak Jain, Director, Siddha Group At the beginning of this year, MMRDA announced its plans for Wadala that has attracted real estate entrepreneurs to this bustling neighbourhood. This strategically located micro market between South Mumbai and the suburbs, the prospect of greater connectivity and employment seems more promising than ever. In

Chembur’s Fascinating Real Estate Transformation

Old chimneys give way to swanky high-rises in Mumbai’s Queen of the Suburbs By Accommodation Times Bureau Prashant Thakur, Head – Research, ANAROCK Property Consultants It was known primarily as an industrial destination with the presence of companies such as RCF and BARC. Today, Chembur is transforming rapidly into a premium real estate

North and South bound ramps of Eastern Freeway at Anik Wadala Rd. opened on Sunday

By Accommodation Times News Services The North and South bound ramps of Eastern Freeway at Anik Wadala Road is opened for vehicular traffic from, Sunday, April 6, 2014. “MMRDA has now completed the construction of bridges across Mahul Creek and approach roads on either side of the elevated portion for entry and exit at Anik

Mumbai transport infrastructure projects are estimated to Rs.270,000Cr: CM

By Nawaz Sayyed Mumbai: On Thursday addressing to gathering in media conclave conducted by the Indian Merchants’ Chamber, CM Prithviraj Chavan said that “MMRDA’s main objective to make Mumbai slum free and provide a smooth road infrastructure.” He added that “the estimated investment of $50 billion (Rs 2,70,000 crore) is based

Monorail integration with CR, WR and Harbour Line

Railway stations of Mahalakshmi, Curry Road, Parel, Wadala Station, Chembur and GTB Nagar to be integrated Mumbai 26 November 2010: Mumbai’s first monorail corridor on Sant Gadge Maharaj Chowk – Wadala – Chembur route will have integration with the Central Railway, Western Railway and Harbour Line. The monorail stations near

Details of MMRDA projects in 2018

By Accommodation Times Bureau MUMBAI: The Authority, in the year 2018, has undertaken many mega infrastructure projects and the paved way forward towards completing them on a war footing. The two Metro corridors – 18.5-km Dahisar-W to DN Nagar Metro-2A (Rs 6,410 crore) and 16.5-km Andheri-E to Dahisar-E Metro-7 Corridor (Rs 6,208 crore)

MMRDA ends LTSE’s Mono contract, takes over operations

By Accommodation Times Bureau MUMBAI: The Mumbai Metropolitan Region Development Authority (MMRDA), on Friday, terminated the contract which was entered into with LTSE – the joint venture by Larsen & Toubro Ltd. and SCOMI Engineering BHD (LTSE) – for their failure to perform and fulfil contractual obligations. Rajeev, Metropolitan Commissioner, MMRDA said, “This

MMRDA invites tenders to construct elevated viaduct and stations

Accommodation Times News Service The Mumbai Metropolitan Region Development Authority (MMRDA) has put two more Metro rail projects – DN Nagar to Mankhurd Metro-2B and Wadala to Kasarvadavali Metro-4 – on fast track and has invited tenders to design and construct elevated viaducts and stations. The Authority has invited tenders from eligible