NH Projects in Tamil Nadu

NHAI-LogoBy Accommodation Times Bureau

The Ministry of Road Transport and Highways (MORTH)  has approved Annual Plan consisting of 34 nos. of projects amounting to Rs. 915.71 Crore for development of 408.52 kms of National Highways under NH (O) for 2017-18. Besides, National Highway Authority of India has also targeted to award 14 nos. of projects amounting to Rs.12774.67 crore for development of 601.52 kms of National Highways in Tamil Nadu for the year 2017-18.  Detail of projects to be sanctioned/awarded is as follows:-

Sl.
No
Name of Project Length  (Km) Amount                    (Rs. in Crore)
PROJECT UNDER NH(O) THROUGH STATE PWD
1 Preparation of 17 nos. DPR   30.78
2 Widening from km 475/0 – 480/0 & 485/0 – 487/875 of NH 67 8.400 21.00
3 Widening of road from km 394/6-396/2 of NH 67 1.600 12.00
4 Widening to 2 lane including 1.5 m paved shoulder of Dindigul-Natham-Kottampatti road of NH 383 52.00 340
5 Widening of two lane to two lane with paved shoulder from km 69/0-72/7 of NH 45A 3.70 6.00
6 Providing Paved shoulders including improvements from Km 0/0-56/0 (Mangalore-Villupuram Road)  of NH 234 56.00 81.00
7 Providing paved shoulders to Km 362/2 – 362/790 and 364/555 – 375/0 of NH 67 6.04 42.00
8 Strengthening from  Km 236/0-256/0 (Karur- Coimbatore section) of NH 67 20.000 22.50
9 Strengthening from km 271/0-274/0, 279/0-290/0,  292/0-323/850 (Karur- Coimbatore section) of NH 67 45.850 56.00
10 Strengthening from Km 76/0-78/2 of NH 209 2.200 1.80
11 Strengthening from km 340/0-350/0 of NH 67 (Coimbatore Corporation area) 10.000 15.00
12 Strengthening from km 36/0 to 39/0 & 48/0 to 58/0 of NH 49 Extn. 13.000 14.75
13 Strengthening from km 323/850-331/0 of NH 67 7.150 5.50
14 Strengthening from km 374/2-375/0, 377/0-378 of NH 67 1.800 1.50
15 Strengthening from km 160/0-161/4, 172/0-173/0, 176/0-177/0, 201/0-209/0, 211/0-212/0 of NH 208 12.400 14.00
16 Strengthening from km 101/6-114/0, 119/0-120/0 of NH 208 13.400 15.25
17 Strengthening from km 391/0-405/0, Km 419/6-422/0, 425/0-429/6, 430/0-431/600 of NH 67 22.600 23.00
18 Strengthening from km 3/2-5/0 of NH 49 & in km 15/4-16/8,74/0-76/450,77/6-80/0 of NH 49 Extn. 8.050 16.25
19 Strengthening from km 0/0-10/0 including construction of centre median at km 0/0-4/0 of Trichy -Ramanathapuram Road of NH 210 10.000 14.00
20 Strengthening from km 170/0-172/0, 176/0-180/0, 191/0-198/0, 206/0-211/400, 212/400-222/0, 222/0-227/800,256/0-265/800 of NH 209 52.600 50.00
21 Strengthening from km 81/0-86/0,92/0-100/0, Km 104/0-114/2,119/0-120/6 of NH 209 24.800 31.00
22 Strengthening from km 60/8-64/0 of NH 45A 3.20 15.00
23 Strengthening from Km 60/700 – 67/400 & Km 71/200 – 81/0 16.500 15.00
24 Strengthening  in Km 58/0-64/0 & 80/0-90/0 16.00 14.00
25 Widening of CC Pavementin Km 0/035-1/230 including Widening and strentening of exisisting bituminious surface in KM 0/0-0/035 of NH 45A 1.23 10.28
26 Reconstruction of Culverts 7 no. Culvert on NH 45A   2.50
27 Construction retaining wall at Km 621/2, 622/10 & 627/10-628/2, Widening the existing narrow slab culvert at km.625/4, 627/8, 627/10 of NH 47   5.00
28 Reconstruction of Slab Culvert at Km 13/4, Widening of Culvert at Km 16/6 (L/s)   0.50
29 Provision of Additional bridge with approach at Km.16/2 of NH 207   3.00
30 Rehabilitation of minor bridge at km 60/10 & 64/6 of NH 234   1.50
31 Reconstruction of weak and Narrow minor bridge at km 27/8 and 45/2 of NH 209   2.00
32 Reconstruction of culvert at Km34 nos. Culverts on  NH 208.   12.00
33 Reconstruction of box culvert at km 71/8 & km 103/4 (ii) & Construction of minor bridge at km 103/4 (i)  & Reconstruction of Storm water drain at km 10/0-11/0 of NH 45A   5.60
34 Construction of High level bridge at Km 236/10 of NH 209   16.00
  Total 408.52 915.71
PROJECT UNDER NHAI
1 6-laning of Chennai – Tada section from Km 21.000 to Km 54.400 (balance works) of NH 5 33.40 380.00
2 6-laning of Wallajahpet – Chinnayyanchatram section from Km 107.091 to Km 59.800 (balance works) – – Package I of NH 4 47.29 918.53
3 6-laning of Chinnayyanchatram – Sriperumbudur section from Km 59.800 to Km 35.800 (balance works)  – Package I of NH 4 22.00 670.47
4 4-laning of Trichy – Kallagam section (Package-I of Trichy – Chidambaram section) of NH 227 38.70 1192.00
5 4-laning of Kallagam – Meensuruti section (Package-II of Trichy – Chidambaram section)  of NH 227 59.74 1183.00
6 4-laning of Meensuruti – Chidambaram section (Package-III of Trichy – Chidambaram section)  of NH 227 31.35 577.00
7 4-laning of Viluppuram – Puducherry section (Package-I of Viluppuram – Nagapattinam section) of NH 45A 29.00 896.00
8 4-laning of Puducherry  –  Poondiankuppam section (Package-II of Viluppuram – Nagapattinam section) of NH 45A 38.00 1123.00
9 4-laning of Poondiankuppam  –   Sattanathapuram section (Package-III of Viluppuram – Nagapattinam section) of NH 45A 56.80 1814.00
10 4-laning of Sattanathapuram  –  Nagapattinam section (Package-IV of Viluppuram – Nagapattinam section) of NH 45A 56.82 1490.00
11 2-lane with Paved Shoulders of Karaikudi – Ramanathapuram section from Km 94.000 to Km 174.000 of NH 49 80.00 496.57
12 4-laning of Vikravandi – Thanjavur section (Package-III: Cholapuram – Thanjavur section from Km 116.440 to Km 164.275) of NH 45C 47.84 918.87
13 Construction of Oddanchatram Bypass on NH-209 from Km 23.230 to Km 30.900 as Standalone Project of NH 45C 10.10 159.00
14 4-laning of Vikravandi – Thanjavur section (Package-II: Sethiyathoppu – Cholapuram section from Km 65.960 to Km 116.440) 50.48 956.23
  Total 601.52 12774.67

 

 







Similar Articles